Categories
Hydro Electricity News

Lawmakers, other elected officials say ‘no’ to proposed Cuffs Run energy project [Video]

Lawmakers, other elected officials say ‘no’ to proposed Cuffs Run energy project

Lawmakers and other elected officials from across York and Lancaster Counties are voicing their opposition to a proposed $2.3 billion hydroelectric dam project.

The project includes the construction of a 225-foot high, 1.8-mile dam and power turbine pumped storage facility in Chanceford Township, York County, along the Susquehanna River.

Costs have increased from $2.1 to $2.3 billion.

The lawmakers’ opposition comes after the Federal Energy Regulation Commission (FERC) accepted a preliminary permit application for construction.

Read the full article here: https://www.fox43.com/article/news/local/york-county/lawmakers-elected-officials-lloyd-smucker-york-energy-storage-william-mcmahon-cuffs-run-energy-project/521-ea153828-ad41-4a1a-bb44-4ac84ebf8051

WPMT-FOX43’s YouTube channel is a hub for the best of FOX43 News and its investigative reports, top headlines, and digital exclusive content:
youtube.com/c/fox43 SUBSCRIBE: youtube.com/c/fox43

Watch/Read More